Wind Met Mast Kuhbett

Project description

The wind met mast recorded the wind speed inside the planned Kuhbett wind park for 12 months. The results, or more precisely information about the wind speed and distribution, will help us to plan the wind farm with an optimum design.


Technical data:


Measuring mast height: 141.5 m

Location height: 634 m above sea level

Measuring heights: 60 m, 80 m, 105 m, 130 m, 139 m, 141 m

Measuring equipment:
6 x cup anemometer
3 x wind vane
2 x temperature
1 x air humidity

Planning: 2015

Construction: 2015

Commissioning: August 2015

 

Operator:

Dunoair Windpark Planung GmbH

Location:

Hesse, Limburg-Weilburg County, City of Bad Camberg