Krastel-Leideneck wind farm (2014)


Production


kWh

CO2 -t CO2 avoided
Haushalte - German three-person model-households supplied

Krastel-Leideneck wind farm

Since 2.9.2014, the first rotor in the Krastel-Leideneck wind farm has been turning. Then, at the beginning and end of October, the second and third turbines were added. The fourth turbine was connected to the grid on 31.10.2014.

Since then, our first wind farm with Enercon E-101 turbines was installed.

The electricity produced is fed into DunoAir’s own substation in Mastershausen.

Show Energy Yield

Planning: 2010

Construction: 2013

Inbetriebnahme:

Autumn 2014

Turbines:

4 x E-101 / 135 m (3,05 MW)

Operator:

1. - 4. Windpark Krastel
GmbH & Co. KG

Location:

Rhineland-Palatinate, Rhein-Hunsrück-Kreis, Katellaun, Bell

Windstatistics
Hahn Airport

view statistics

Environmental balance

ESTIMATED YIELD26,57 MIO. KWH
CO2-SAVINGS13,97 TONNEN
SO2-SAVINGS13,57 TONS
ELECTRICITY FOR 6.850 3-PERSONS HOUSEHOLDS