Since 2.9.2014, the first rotor in the Krastel-Leideneck wind farm has been turning. Then, at the beginning and end of October, the second and third turbines were added. The fourth turbine was connected to the grid on 31.10.2014.
Since then, our first wind farm with Enercon E-101 turbines was installed.
The electricity produced is fed into DunoAir’s own substation in Mastershausen.
Autumn 2014
4 x E-101 / 135 m (3,05 MW)
1. - 4. Windpark Krastel
GmbH & Co. KG
Rhineland-Palatinate, Rhein-Hunsrück-Kreis, Katellaun, Bell
ESTIMATED YIELD | 26,57 MIO. KWH |
CO2-SAVINGS | 13,97 TONNEN |
SO2-SAVINGS | 13,57 TONS |
ELECTRICITY FOR 6.850 3-PERSONS HOUSEHOLDS |