Kappel-Faas wind farm (2013)


Production


kWh

CO2 -t CO2 avoided
Haushalte - German three-person model-households supplied

Wind farm Kappel-Faas

The Kappel-Faas wind farm was acquired from the FUTURA Group as a turnkey installation in 2013. The two Enercon E-82 E2 wind turbines are located directly on the cable route between the Kappel wind farm and DunoAir’s own substation in Mastershausen which is why DunoAir’s takeover of the Kappel-Faas wind farm was particularly opportune.

Show Energy Yield

Planning: 2010

Construction: 2012

Commissioning:

Summer 2013

Turbines:

2 x E-82 E2 (2,3 MW)

Operator:

Dunoair Windpark Kappel
GmbH & Co. KG

Location:

Rhineland-Palatinate, Rhein-Hunsrück-Kreis, Kastellaun, Kappel

Windstatistics
Hahn Airport

view statistics

Environmental balance

ESTIMATED YIELD11,49 MIO. KWH
CO2-SAVINGS6.000 TONS
SO2-SAVINGS5,9 TONS
ELECTRICITY FOR 2.900 3-PERSONS HOUSEHOLDS